Products Case Studies Blog Downloads Contact About
Menu Button
Case Studies Blog Downloads Contact About

Hussmann

A new challenge arrived with the offices of Hussmann in CiƩnega de Flores. The project involved improving lighting, reducing energy consumption and generating savings in the best possible time. The location of windows was used to regulate the lighting in each space, thus giving positive results with future objectives.

Hussmann lighting installations Hussmann lighting installations
flat-panel flat-panel

Flat Panel

When the 2x2 Panels were installed, the improvement in the different areas of work was noted, together with a saving of 82% and a payback of 1.8 years, a favorable result.

Benefits

Payback

Payback

1.8 years

Reduction

Reduction

16 kW of the system

IRR

IRR

106%

Savings

Savings

82%

Hussmann lighting installations Hussmann lighting installations

Natural Environment

Acres Of Forest

Acres of Forest

Acres

16 TM

Gasoline

Gasoline

8,473

CO2

CO2

75 TM

Any questions? Please, send us an email!

This website uses its own and third-party cookies to improve your browsing experience and perform analytical tasks. If you continue browsing in this site, you agree with our Cookies Policy

OK